Worcester 30Cdi Flue Manual
Worcester Greenstar 3. CDi System Boiler ERP 7. As a powerful 3. 0k. View and Download Worcester Greenstar FS 30CDi Regular instruction manual online. Worcester Floor Standing RSF GasFired Condensing Regular Boiler. Greenstar FS 30CDi. I have a Worcester Greenstar 30CDi combi boiler or is it a 35 not sure, which has an intermittent but recurring fault that causes it to stop working until I reset it. W boiler, the Worcester Greenstar 3. CDi System boiler is perfectly suited for use in larger properties with a substantial heating requirement. Its high efficiency features allows it to qualify for a SEDBUK A Rating, meaning it is highly recommended for new installations. Greenstar-CDi-Classic-Regular.jpg' alt='Worcester 30Cdi Flue Manual' title='Worcester 30Cdi Flue Manual' />Designed for larger properties that may have a high number of radiators and a large cylinder the 3. CDi currently comes with a 5 year manufacturer warranty. Central Heating Output 3. WBTU Output 1. 00,0. Manufacturer product number 7 7. The Worcester 3. 0CDi System Boiler is not supplied with a flue or timer as standard. You can add any additional flues, extensions and controllers to your basket separately please check the right hand side of this page for popular choices. Features. A rated efficiency. Combined drain and condensate within the boiler. Low energy pump now as standard. Within this Worcester Bosch Programmers Room Thermostats also knowm as Time Clocks or Timers category we list all Worcester Bosch Clocks, Programmers and Room. Earth bonding strip fitted to hydraulic assembly as standard. Solar compatible. Worcester 24CDi RSF Combi Faulty fan 8716120034. Worcester 24CDI RSF Worcester 8716120034 Fan Assembly replacement. Boiler GC number is 47 311 30. New Er. P compliant pump. Wall mounting frame with pipes behind no exposed pipework. Low NOx and CO2 emissions. Year warranty on Greenstar Gas Boilers as standard terms and conditions apply. The 3. 0CDi System Boiler has been revised to include a new Er. P compliant pump, bringing it in line with new legislation covering new boilers and other heating appliances. Er. P regulations are being put in place in an effort to reduce carbon emissions across the UK, and a new A rated combi boiler is the perfect way to comply with this legislation. Order your Worcester Greenstar 3. CDi Classic System Boiler ERP 7. From Direct Heating Supplies for speedy delivery within 2 working days as standard. WORCESTER GREENSTAR FS 3. CDI REGULAR INSTRUCTION MANUAL Pdf Download. THE APPLIANCE IS FOR USE WITH NATURAL GAS OR L. P. G. Cat II 2. H3. P TYPE C1. 3, C3. C5. 3 C9. 3 NATURAL GAS GREENSTAR FS 3. CDi REGULAR GC NUMBER 4. GREENSTAR FS 4. 2CDi REGULAR GC NUMBER 4. LIQUID PETROLEUM GAS GREENSTAR FS 3. CDi REGULAR GC NUMBER 4. SUCH AS A BRITISH GAS OR OTHER CORGI REGISTERED PERSONNEL. WEBSITE worcester bosch. FAILURE TO INSTALL CORRECTLY COULD LEAD TO PROSECUTION. IF YOU ARE IN ANY DOUBT CONTACT THE WORCESTER TECHNICAL SUPPORT WATER TREATMENT HELPLINE. FERNOX 0. 17. 99 5. DISTANCE LEARNING AND TRAINING COURSES ARE AVAILABLE FROM WORCESTER, fernox. CONTENTS SAFETY REGULATIONS SAFETY PRECAUTIONS INSTALLATION REGULATIONS APPLIANCE INFORMATION GENERAL INFORMATION TECHNICAL DATA LAYOUT COMPONENTS PRE INSTALLATION CLEANING PRIMARY SYSTEMS MAINS SUPPLIES WATER SYSTEMS PIPEWORK CONDENSATE PIPEWORK BOILER LOCATION CLEARANCES MOUNTING FRAME CONNECTIONS FLUE OUTLET POSITIONS ROOM SEALED FLUE OPTIONS INSTALLATION UNPACKING THE BOILER MOUNTING FRAME FIXING FLUE OPENING. SAFETY PRECAUTIONS INSTALLATION REGULATIONS IF YOU SMELL GAS Failure to install appliances correctly could lead to prosecution. DONT SMOKE OR STRIKE MATCHES. DONT TURN ELECTRICAL SWITCHES ON OR OFF. This appliance must be installed by a competent registered engineer, such as British DO PUT OUT NAKED FLAMES. GENERAL INFORMATION STANDARD PACKAGE A Floor standing gas fired regular boiler B Mounting frame complete with pre plumbing manifold assembly C Literature pack D Condensate hose and non return valve SPECIFICATIONS Pre wired and pre plumbed. Galvanised steel inner frame. Bosch Heatronic control system. TECHNICAL DATA DESCRIPTION UNITS Natural Gas L. P. G FS 3. 0CDi FS 4. CDi FS 3. 0CDi FS 4. CDi Central Heating Max. C 3. 2. 1 4. 3. 7 3. Max. rated heat output net 5. C 3. 1. 8 4. 3. 3 3. Max. rated heat output net 8. C 4. 0. 8 4. 0. 8 Max. LAYOUT COMPONENTS The diagram opposite shows the controls in the servicing position and excludes the outer case, inner covers and wiring. CONTROL PANEL 2 MASTER SWITCH FOR ONOFF 3 BURNER ON INDICATOR LIGHT GREEN 4 SERVICE BUTTON 5 BOOST BUTTON SERVICE ONLY 6 DISPLAY 7 RESET BUTTON 8 NOT USED. CLEANING PRIMARY SYSTEMS IMPORTANT All the following pre installation sections must be read and IMPORTANT requirements met before starting boiler or flue installation. Debris from the system can damage the boiler and reduce efficiency. Failure to comply with the guidelines for the use of water treatment with the appliance CAUTION ISOLATE THE MAINS SUPPLIES BEFORE STARTING ANY WORK will invalidate the appliance warranty. MAINS SUPPLIES ELECTRICAL SUPPLY Supply 2. V 5. 0Hz. Cable PVC insulated 0. C. External 3. A fuse to BS1. The appliance must be earthed. It must be possible to isolate the appliance from the electrical supply with at least a 3mm contact separation in both poles supplying the appliance. WATER SYSTEMS PIPEWORK PRIMARY SYSTEM PLASTIC PIPEWORK Any plastic pipework must have a polymeric barrier with 6. Plastic pipework used for underfloor heating must be correctly controlled with a thermostatic blending valve limiting the temperature of the circuits to approx. WATER SYSTEMS PIPEWORK S PLAN LAYOUT S Y PLAN OPEN VENT PRIMARY SYSTEM Generally a by pass is not necessary on a Y plan min. The feed and expansion cistern N must be positioned to provide a static head M of at least 2. CONDENSATE PIPEWORK IMPORTANT Visible air break Ensure there are no at plug hole blockages in the pipe run Sink with Care should be taken when Condensing integral siting a soak away to avoid Boiler overflow 1. Insulation or increase pipe size. INSTALLATION CLEARANCES BOILER LOCATION CLEARANCES 4. This boiler is only suitable for installing 6. BOILER LOCATION CLEARANCES 4 AIRING CUPBOARD CLEARANCES 6. AIRING CUPBOARD CLEARANCES Diagram 4 opposite shows the minimum space equired to install and service the boiler 1. VENTING COMPARTMENTS 5 VENTING If the clearances are less than those stated COMPARTMENTS for options 3 amp. MOUNTING FRAME CONNECTIONS CONNECTIONS Water 2. Gas 2. 2mm compression fitting. RUNNING PIPES BEHIND THE BOILER The frame should sit against the wall not the skirting board with enough room for the pipework. Do not cross a pipe over another. The flue must be fitted and terminated in accordance with the recommendations of BS5. Part 1. The flue must not cause an obstruction. Directx 9.0 C Windows 7 on this page. Discharge and any noise from the flue outlet must not cause a nuisance. FLUE OUTLET POSITIONS NOTES Plume management kits are available for 1. Please refer to the installation instructions supplied with the plume management kits. If plume redirection is utilised, the clearance from any opening must be increased in the direction of the plume to 1. ROOM SEALED FLUE OPTIONS L 1. L 1. 25mm 9. 00. L 1. The diagrams opposite show the components used and the maximum flue length for each configuration of 1. Only straight flue sections can be reduced Min. UNPACKING THE BOILER IMPORTANT All the previous Pre Installation sections must be read and requirements met before starting boiler or flue installation. Take care not to damage the boiler panels or the floor and note that the boiler may contain some water due to factory testing. Unpacking Undo the ties securing the carton to the pallet. All dimensions in mm MOUNTING FRAME FIXING FLUE OPENING CAUTION Ensure there are no pipes, electric cables, damp proof course or other hazards before drilling. SAFETY All relevant safety precautions must be undertaken. Protective clothing, footwear, gloves and safety goggles must be worn as 7. MOUNTING FRAME CONNECTIONS CAUTION ISOLATE THE MAINS GAS SUPPLY BEFORE STARTING ANY WORK AND OBSERVE ALL RELEVANT SAFETY PRECAUTIONS. GAS AND WATER CONNECTIONS Ensure all pipework is clean and each pipe is in the correct position as shown opposite. Push in each pipe in turn and tighten the fitting to secure. L to check the maximum flue Appliance description L max. Greenstar FS 3. 0CDi Regular 4. Greenstar FS 4. 2CDi Regular 4. FLUE MEASURING CUTTING Flue bends Connecting flue bends increases the effective pipe length and an allowance must be made for the different connectors. The example opposite shows dimensions 1. Adjusting the standard terminal length Extend tube A by withdrawing from tube B to achieve the flue length required. FLUE MEASURING CUTTING FLUE OUTLETS X or Y Remove seal B from flue adaptor A. Cut square to mark, as shown, deburr and clean. Replace seal B. FLUE MEASURING CUTTING INSTALLATION SERVICING INSTRUCTIONS 8 7. FLUE INSTALLATION Grip the outer sides of the front panel F pull and lift away from retaining lugs. Remove retaining screw B to swing control panel assembly A outwards to its full extent. Remove screws C from inside of casing. Lift front of top panel D to release. STANDARD FLUE INSTALLATION NOTE To ease assembly of the flue components, lightly grease seals lightly with the solvent free grease supplied. Check all the seals are seated properly in the grooves provided and are in good condition. All flue joints must be sealed to prevent leakage of condensate and flue products. FLUE TERMINAL PLUME MANAGEMENT The flue discharge can be redirected allowing some plume management control, alternatively, a complete plume management system can be fitted to the flue terminal.